Souks of Beirut - Gold Souks
Commercial Centers

Project Description: The South Souks launch in the last quarter of 2009 has seen the gradual opening of shops, continuing along with restaurants through 2012. In the North Souks, construction of the Entertainment Complex is underway, while design of the Department Store is proceeding.

Role: Generating Sets, Synchronization Panel, Ventilation, Sound Attenuation, Room Sound Insulation, Fume Exhaust Pipes, Fuel System, Insulation and Jacketing, Electrical Main Distribution Boards (MDBs), PLC for Load Shedding, Closed Circuit Television (CCTV), Fire Suppression, Power Cables, Control Cables, and Cable Trays.

Creditors may make enquiries how do payday loans work making a whole.


Subscribe to our E- newsletter

Saccal Worldwide

SACCAL S.A.L. is ISO 9001 certified
  • Media Room
  • Careers
  • Quotation Request
  • Feedback Form
  • Contact Us
  • We are offline
Copyright © SACCAL S.A.L. All Rights Reserved