Project Description: Built in 2005, Four Seasons Hotel Beirut is unabashedly modern, with terraced hotel rooms, a see-and-be-seen rooftop lounge, a luxurious spa, and state of the art features.
Role: Generating Sets, Synchronization Panel, Ventilation, Sound Attenuation, Room Sound Insulation, Fume Exhaust Pipes, Fuel System, Insulation and Jacketing, Electrical Main Distribution Boards (MDBs), PLC for Load Shedding, Closed Circuit Television (CCTV), Fire Suppression, Power Cables, Control Cables, and Cable Trays.