Project Description: The first commercial center in Lebanon reflecting truly the concept of a mall with an elegant interior, a spacious inner atrium and state of the art elevators and escalators.
Role: Generating Sets, Synchronization Panel, Ventilation, Sound Attenuation, Room Sound Insulation, Fume Exhaust Pipes, Fuel System, Insulation and Jacketing, Electrical Main Distribution Boards (MDBs), PLC for Load Shedding, Closed Circuit Television (CCTV), Fire Suppression, Power Cables, Control Cables, and Cable Trays.